Texas Digital Consulting

Modernize

Secure

Operate

Grow

Fixed-price milestones · 5-business-day acceptance · IaC handed over in your repositoryStart with a technical assessment ↗
Every group page lists every tool, each with its own pageAll technologies ↗
Prime contractors · agencies · regulated enterprises · B2B companies
Engineering team across time zones · 24/7 for support plans
Menu
Services
Solutions
Technologies
Services · Modernize

Serverless & ContainersPay Only When It Runs

Low, uneven load costs almost nothing idle; the only steady line is the database.

Timeline 4–12 weeksPrice from $15,000
Short AnswerLow, uneven load costs almost nothing idle; the only steady line is the database.
What You Get

Deliverables.Every Item Is a File, a System or a Report.

Six things you can open, run or audit, each tied to the acceptance checklist of a fixed-price milestone.

  • Fit assessment per workload: functions or containers, decided and written down before anything is built
  • Cost model with monthly estimates by component, so you approve the running bill before the first deploy
  • Functions or containers as infrastructure as code in your repository; a first environment deploys in two weeks
  • Observability from the start: traces, structured logs, alarms wired to on-call and a dashboard your team reads
  • Load test report and tuning of memory, concurrency and cold starts; reserved capacity only where it pays
  • Runbooks for deploy and rollback plus an acceptance checklist per milestone, so your team can run it alone
How We Do It

Four Steps.Each a Milestone with a Checklist.

Four steps, each a milestone with a price, a date and an acceptance checklist.

01
Fit assessment
Each workload is profiled for load, latency and job length and assigned to functions or containers. You approve the written assessment and cost model before build.
02
Build as code
Functions or containers, pipeline and database built as code in your repository. A first environment deploys by week two; milestones are accepted by checklist and demo.
03
Load test and tune
Load tests size memory, concurrency and cold starts; traces, logs and alarms go to on-call. You get the test report and dashboard; a drill proves alarms page someone.
04
Handover and runbooks
Your team runs a deploy and a rollback from the runbooks while we watch. You keep the repository, cost model, dashboards and runbooks, with a support plan if wanted.

Timeline: 4–12 weeks · Price: from $15,000 · Acceptance Rules

Stack

What We Usually Use Here.Every Chip Opens a Page.

What we usually use here. Every chip opens a page; blue is our core stack, dashed is what we migrate from.

All Technologies

Use Cases

When You Need It.Six Situations We See Most.

01APIs with Uneven Traffic

Functions scale to zero overnight and to thousands of requests during peaks.

02Scheduled and Batch Jobs

Nightly imports, document generation and reports as containers or step functions.

03Event-driven Pipelines

Queues and streams that process uploads, webhooks and notifications reliably.

04Re-platforming a Monolith

Modules extracted behind an API one at a time, each as a function or container.

05Cost Reduction

Idle servers replaced with pay-per-use compute and a monthly cost report.

06Container Platforms for Teams That Need Them

Fargate or Kubernetes with CI/CD, autoscaling and observability.

In Depth

What Is Serverless Application Development?How We Deliver It.

Serverless and container development is building applications on functions and managed containers that cost almost nothing idle and scale under load, with infrastructure as code and observability from the start.

For uneven, low-to-medium load, functions on AWS Lambda, Azure Functions or Cloud Run cost less and need less operation than servers; for steady load, long jobs or strict latency, containers on Fargate or Kubernetes are the better tool. Texas Digital Consulting decides per workload in the assessment and shows the cost model before building.

Everything is described as code, deployed by a pipeline without standing keys, and instrumented with traces, structured logs and alarms wired to on-call. Memory, concurrency and cold starts are tuned from real metrics, and reserved capacity is bought only where it pays.

This is our usual architecture for new platforms and the usual target of our modernization projects; the database, not compute, is normally the largest line in the resulting bill.

Related Terms

Updated November 2026 · reviewed by the engineers who deliver this service

Proof

Under NDA.So We Show the Artifacts.

On a call we walk you through anonymized deliverables from this kind of engagement.

Architecture Diagram
Cost Model
Load Test Report
Observability Dashboard
Questions

Before You Write to Us.What Clients Ask About This Service.

What does a serverless project cost?

From $15,000 for an application or API with infrastructure as code, observability and runbooks; larger platforms are priced per fixed-price milestone after the fit assessment. Each milestone has a scope, acceptance criteria and a price written before work starts, and is paid on acceptance. Cloud usage is billed to you directly by your provider; the cost model shows that number before the first deploy.

How long does a serverless build take?

Four to twelve weeks, depending on how many workloads and integrations are in scope. A first environment deploys from your repository within the first two weeks, so you see real infrastructure early rather than slides. The fit assessment at the start fixes the milestone dates for the rest.

Who owns the code, the infrastructure and the cloud account?

You do. Everything is written as infrastructure as code in your repository and deployed into your own cloud account; nothing is hosted by us. Any qualified team can continue the work without us, and our access is revoked at handover.

Do you sign an NDA before looking at our systems?

Yes. We sign your NDA or provide ours before the first call that touches your code, accounts or data. Access is granted by you through named roles in your account, and the pipeline deploys without standing keys, so no credentials sit with us.

What happens after handover?

Your team runs the platform from the runbooks, or you take a support plan with a fixed monthly fee, daily checks and a 2-hour response on critical issues. Under a support plan our own defects are fixed outside the package, at no charge. The traces, alarms and dashboards built during the project are what support or your on-call team uses from day one.

What if a release fails or we dispute a milestone?

Every deploy has a rollback runbook rehearsed at handover, so a failed release reverts to the previous version. You have five business days to review each milestone report; only critical defects delay acceptance, the rest moves to the next milestone, and what your team already runs in real operations counts as accepted. New requirements become separately priced work and never silently extend a milestone.

When is serverless the wrong choice?

When load is steady and high, jobs run for hours, or latency must be flat with no cold-start tolerance. Then containers on Fargate, Cloud Run or Kubernetes are the better tool, and the fit assessment says so in writing per workload. Most platforms end up with a mix: functions for uneven traffic, containers for the long jobs.

Can this run in AWS GovCloud or a FedRAMP-authorized environment?

Yes, when your agency or prime provides the account. Lambda, Fargate and the managed services we use are available in AWS GovCloud, and the same infrastructure as code deploys there through the same pipeline. Encryption, audit logging and least-privilege roles are built in from the start, so the evidence an ATO package asks for is produced during the build rather than reconstructed afterwards.

Next Step

Start With a Two-Week Technical Assessment.

What you have, what it costs to move, what breaks first. Fixed price, written findings, no obligation to continue.

Request a Technical Assessment
01 · 30-min call02 · read access to repos and accounts03 · written findings in 10 business days