Texas Digital Consulting

Modernize

Secure

Operate

Grow

Fixed-price milestones · 5-business-day acceptance · IaC handed over in your repositoryStart with a technical assessment ↗
Every group page lists every tool, each with its own pageAll technologies ↗
Prime contractors · agencies · regulated enterprises · B2B companies
Engineering team across time zones · 24/7 for support plans
Menu
Services
Solutions
Technologies
Services · Operate

DevOps & Infrastructure as CodeInfrastructure in your Repository

Test and production environments, releases through GitHub Actions without standing keys.

Timeline 3–8 weeksPrice from $10,000
Short AnswerTest and production environments, releases through GitHub Actions without standing keys.
What You Get

Deliverables.Every Item Is a File, a System or a Report.

Six things you can open, run or audit, each tied to the acceptance checklist of a fixed-price milestone.

  • Environment inventory that flags hand-made and undocumented parts, so each fixed-price milestone is scoped
  • Infrastructure as code in your repository (CDK, Terraform, Pulumi or Bicep) so any environment can be rebuilt
  • CI/CD pipeline on GitHub Actions or GitLab CI with OIDC roles, so no standing keys sit in CI secrets
  • Test and production environments with promotion rules and blue/green or canary releases you can roll back
  • Written access model: who deploys, who approves, which roles the pipeline assumes, ready for audit or handover
  • Runbooks with drift detection, cost tags and access reviews, so your team or a support plan can run it alone
How We Do It

Four Steps.Each a Milestone with a Checklist.

Four steps, each a milestone with a price, a date and an acceptance checklist.

01
Inventory and scope
We list every environment, flag hand-made and undocumented parts and agree the IaC tool. You approve a milestone plan with prices before anything is codified.
02
Codify and pipeline
Environments become CDK, Terraform, Pulumi or Bicep in your repository; the pipeline builds, tests and deploys to test through OIDC roles. Accepted on checklist and demo.
03
Promote with rollback
Production deploys through the pipeline with approvals; we run a canary or blue/green release and a rollback drill you watch. Accepted on the drill report and checklist.
04
Handover and operate
You keep the repository, pipeline, runbooks, access model and drift alerts; a walkthrough closes the last milestone. Your team runs it alone, or a support plan does.

Timeline: 3–8 weeks · Price: from $10,000 · Acceptance Rules

Stack

What We Usually Use Here.Every Chip Opens a Page.

What we usually use here. Every chip opens a page; blue is our core stack, dashed is what we migrate from.

All Technologies

Use Cases

When You Need It.Six Situations We See Most.

01Codifying an Existing Cloud Account

Resources imported into Terraform or CDK with a plan that shows drift.

02CI/CD for a Team That Deploys by Hand

Build, test, deploy to test, approve, deploy to production, with rollback.

03Environments per Branch or Client

Ephemeral test environments and per-tenant stacks from one definition.

04Pipeline Security

Standing keys replaced with OIDC roles; secrets in a vault; signed releases.

05Handover Packages

Infrastructure, runbooks and access model delivered to an agency or new vendor.

06Multi-account Landing Zones

Organization, accounts, networking and logging as code.

In Depth

What Is DevOps as a Service and Infrastructure as Code?How We Deliver It.

DevOps and infrastructure as code means every environment is described in code in your repository and deployed by a pipeline with short-lived credentials, so releases are repeatable and reviewable.

Hand-made environments drift and cannot be rebuilt. Texas Digital Consulting codifies them with AWS CDK, Terraform, Pulumi or Bicep, importing what exists where possible and rebuilding the rest. Test and production environments get promotion rules, releases run blue/green or canary with a rollback, and pipelines authenticate through OIDC instead of stored keys.

The access model is written down: who can deploy, who can approve, which roles the pipeline assumes. Drift detection, cost tags and periodic access reviews keep the setup honest after handover. The result is a repository any qualified team can operate.

For contractors this is the deliverable agencies increasingly require at handover; for companies it is what makes the next migration or audit a routine task.

Updated November 2026 · reviewed by the engineers who deliver this service

Proof

Under NDA.So We Show the Artifacts.

On a call we walk you through anonymized deliverables from this kind of engagement.

IaC Repository Structure
Pipeline Definition
Environment Promotion Diagram
Access Model
Questions

Before You Write to Us.What Clients Ask About This Service.

How much does DevOps and infrastructure as code cost?

From $10,000 for one application's environments and pipeline, priced as fixed milestones in the written scope. Landing zones, multi-account setups and per-tenant stacks are priced per milestone after the inventory. Cloud costs are paid by you directly to the provider; we give you the cost model.

How long does it take?

Three to eight weeks for one application. The inventory comes first, the first pipeline usually deploys to a test environment in week two, and production promotion with a rollback drill comes last. Multi-account landing zones run longer and are planned milestone by milestone.

Who owns the code, pipelines and cloud accounts?

You do. The infrastructure code and pipeline definitions live in your repository, the environments run in your cloud account and the pipeline assumes roles you control. If we leave, nothing stops; any qualified team can continue from the repository and runbooks.

Do you sign an NDA before looking at our accounts?

Yes. Most engagements run under one: we sign yours or provide ours before the first call that touches your systems. We work through named, least-privilege roles you can revoke on your side, and the roles we use are part of the written access model you receive at handover.

Can you import what we already have instead of rebuilding it?

Mostly yes. Existing resources are imported into Terraform or CDK state, and the plan shows the drift between code and reality. Parts that cannot be imported cleanly are rebuilt in a test environment first and swapped under the promotion rules, with a rollback at each step.

Does this help with an ATO or a FedRAMP-aligned environment?

It produces the evidence an assessor asks for: environments as reviewable code, pipelines with short-lived OIDC credentials, a written access model and a log of every deployment. We map the setup to NIST 800-53 control families where you need it; the authorization itself stays with your agency or prime.

What if a release breaks production?

You roll back. Blue/green and canary releases keep the previous version live until the new one passes its checks, and the rollback is rehearsed before production is accepted. If a milestone fails its checklist, only critical defects delay acceptance; the rest moves into the next milestone, and scope changes are priced separately.

Who runs the pipeline after handover?

Your team, from the runbooks, or ours under a support plan with a fixed monthly fee, daily checks of pipelines and backups and a 2-hour response on critical issues. Drift detection and access reviews are scheduled in the runbooks, so the setup stays in code either way.

Next Step

Start With a Two-Week Technical Assessment.

What you have, what it costs to move, what breaks first. Fixed price, written findings, no obligation to continue.

Request a Technical Assessment
01 · 30-min call02 · read access to repos and accounts03 · written findings in 10 business days