Cloud MigrationAWS, Azure or Google Cloud, Cutover with Rollback
Parallel run, switch-over window and a documented way back.
Deliverables.Every Item Is a File, a System or a Report.
Six things you can open, run or audit, each tied to the acceptance checklist of a fixed-price milestone.
- Inventory, dependency map and cost baseline, so each wave is scoped and priced before anything moves
- Landing zone as code in your repository: accounts, network, SSO, logging, backups
- Wave plan with dependencies, cutover windows and a rehearsed rollback for each fixed-price milestone
- Databases and files moved with a reconciliation report; legacy stays read-only until you accept
- Cost model before and after, then a monthly cost report showing what to right-size, reserve or switch off
- Operations runbooks and monitoring, handed over with an acceptance checklist so your team can run it
Four Steps.Each a Milestone with a Checklist.
Four steps, each a milestone with a price, a date and an acceptance checklist.
Timeline: 8–24 weeks · Price: from $20,000 · Acceptance Rules
What We Usually Use Here.Every Chip Opens a Page.
What we usually use here. Every chip opens a page; blue is our core stack, dashed is what we migrate from.
When You Need It.Six Situations We See Most.
Servers and VMware workloads moved to a landing zone in waves before a lease or hardware deadline.
Applications moved as they are, then re-platformed to managed services where the cost model shows savings.
FedRAMP-authorized regions, GovCloud or Azure Government with controls mapped to NIST 800-53.
Identity federation and private links between on-premises systems and the cloud.
Applications on end-of-life hosting moved to serverless or containers with CI/CD.
Accounts, costs and access centralized under one landing zone and one identity.
What Are Cloud Migration Services?How We Deliver It.
Cloud migration is the planned move of servers, databases and applications from on-premises or a legacy host to AWS, Azure or Google Cloud, in waves with cutover windows and a tested rollback.
A migration plan that survives contact with reality is a list of waves with dependencies, a cutover window per wave and a rollback that was rehearsed. Texas Digital Consulting starts with an inventory of servers, databases, integrations, licenses and owners, then builds a landing zone as code: accounts, network, identity, logging and backups.
Low-risk systems move first. Each wave has a verification list and a cost model, databases move together with their applications, and the legacy environment stays read-only until acceptance. Afterwards we right-size, reserve what runs steadily and switch off what nobody uses, with a monthly cost report.
We work in AWS, Azure (including Azure Government) and Google Cloud and choose by your team, licenses and compliance needs. Hybrid setups with part of the estate on-premises are common and planned explicitly.
Who It Is For
Related Articles
Related Terms
Updated November 2026 · reviewed by the engineers who deliver this service
Under NDA.So We Show the Artifacts.
On a call we walk you through anonymized deliverables from this kind of engagement.
Before You Write to Us.What Clients Ask About This Service.
How much does a cloud migration cost?
From $20,000 for the landing zone and the first wave; the full estate is priced per wave after discovery, each wave a fixed-price milestone paid on acceptance. Cloud usage is billed by the provider to you directly, with no markup, and the before-and-after cost model is part of the deliverable.
How long does a cloud migration take?
Eight to twenty-four weeks, depending on the number of waves. The landing zone is usually ready in three weeks; each wave then has its own cutover window in the plan, so the end date is set wave by wave after discovery rather than guessed up front.
Who owns the cloud accounts and the landing zone?
You do. The cloud accounts are opened in your organization's name and billed to you; the landing zone, network and pipelines are code in your repository. We work through roles you can revoke on the last day, and any qualified team can continue from the repository without us.
Do you sign an NDA before seeing our inventory?
Yes. We sign yours or provide ours before the first call that touches your systems or network diagrams. Our access during discovery is granted through your identity provider and removed at handover.
What happens if a cutover fails?
We roll back to the legacy environment, which stays read-only and intact until you accept the wave. Every wave has a rehearsed rollback and a go/no-go check at the start of the window. The milestone is paid only on acceptance, so a failed cutover is retried, not billed twice.
Can part of our systems stay on-premises?
Yes, hybrid estates are common and planned explicitly. We set up private connectivity and identity federation and write down the boundary of what stays and why, so the dependency map shows which on-premises systems each wave still talks to.
Can you migrate government workloads with FedRAMP requirements?
Yes. We build the landing zone in FedRAMP-authorized regions, AWS GovCloud or Azure Government, and map controls to NIST 800-53 so your ATO package can reference the configuration as code. Logging, backups and access controls are part of the landing zone, not an add-on.
Who runs the environment after the last wave?
Your team, from the runbooks and monitoring handed over at the last milestone, or a support plan with a fixed monthly fee, daily checks and a 2-hour response on critical issues. Either way, the documentation is written so the environment can be run without us.
Start With a Two-Week Technical Assessment.
What you have, what it costs to move, what breaks first. Fixed price, written findings, no obligation to continue.
Request a Technical Assessment