Texas Digital Consulting

Modernize

Secure

Operate

Grow

Fixed-price milestones · 5-business-day acceptance · IaC handed over in your repositoryStart with a technical assessment ↗
Every group page lists every tool, each with its own pageAll technologies ↗
Prime contractors · agencies · regulated enterprises · B2B companies
Engineering team across time zones · 24/7 for support plans
Menu
Services
Solutions
Technologies
Services · Secure

Backups & Disaster RecoveryTested Restores, Two Regions

Backups protected from deletion, a copy in another region and a restore that has actually been run.

Timeline 2–4 weeksPrice from $5,000
Short AnswerBackups protected from deletion, a copy in another region and a restore that has actually been run.
What You Get

Deliverables.Every Item Is a File, a System or a Report.

Six things you can open, run or audit, each tied to the acceptance checklist of a fixed-price milestone.

  • Backup policy with RTO and RPO per system, agreed with your business, so you know what comes back and how fast
  • Managed backups with vault lock, encryption and a second-region copy that nobody can delete during retention
  • Alarms on failed backups, so a missed job is seen the same day instead of on the day you need the restore
  • Timed restore drill into a clean environment, with a report that shows your real recovery time against the RTO
  • Disaster recovery runbook that tells your team who does what, in which order, when a system is down
  • Quarterly drill schedule with a review after every infrastructure change, so the plan stays proven
How We Do It

Four Steps.Each a Milestone with a Checklist.

Four steps, each a milestone with a price, a date and an acceptance checklist.

01
Agree the policy
We inventory your systems and agree RTO, RPO and retention per system with the business. You approve a written backup policy that fixes the scope and price of the build.
02
Build the backups
Managed backups with vault lock, encryption and a second-region copy, as code in your repository, plus alarms on failed jobs. Accepted by checklist and a test alarm.
03
Run the restore drill
We restore into a clean environment with a timer running and check data and logins. You get a report of real recovery time against the RTO; it is the acceptance evidence.
04
Hand over the runbook
You keep the policy, the backup code in your repository, the drill report and a DR runbook naming who does what. Drills continue quarterly, with your team or on support.

Timeline: 2–4 weeks · Price: from $5,000 · Acceptance Rules

Stack

What We Usually Use Here.Every Chip Opens a Page.

What we usually use here. Every chip opens a page; blue is our core stack, dashed is what we migrate from.

All Technologies

Use Cases

When You Need It.Six Situations We See Most.

01Ransomware Readiness

Immutable backups in a second region and a rehearsed restore of the full platform.

02Compliance Evidence

RTO, RPO, retention and drill reports documented for auditors and contracts.

03Database Restores

Point-in-time recovery tested for managed PostgreSQL, SQL Server and MongoDB.

04File and Document Archives

Object storage with versioning, lifecycle rules and verified restores.

05Legacy Decommission

Final archive with recorded checksums and a tested restore before switch-off.

06Support Plan Integration

Daily backup checks and quarterly drills as part of managed support.

In Depth

What Are Backup and Disaster Recovery Services?How We Deliver It.

Backups and disaster recovery is the design, implementation and regular testing of backups and restore procedures so a system can be brought back within an agreed time with an agreed maximum data loss.

A backup that has never been restored is a hope, not a plan. Texas Digital Consulting agrees RTO and RPO per system with the business, implements managed backups with deletion protection and a copy in a second region, and then restores into a clean environment with a timer running. The drill report is the deliverable.

Vault lock means an administrator account, or an attacker who has taken one, cannot delete backups inside the retention window. Alarms fire on failed backups, and the drill repeats quarterly and after every infrastructure change. The runbook tells your team who does what and in which order.

This is a standing milestone in every platform we build and a frequent standalone engagement for organizations that discovered their backups only on the day they needed them.

Technologies

Updated November 2026 · reviewed by the engineers who deliver this service

Proof

Under NDA.So We Show the Artifacts.

On a call we walk you through anonymized deliverables from this kind of engagement.

Backup Policy
Restore Drill Report
DR Runbook
Vault Configuration Excerpt
Questions

Before You Write to Us.What Clients Ask About This Service.

How much does a backup and disaster recovery project cost?

From $5,000 for the policy, the implementation and a first timed restore drill on one platform. Several databases, regions or systems without a managed backup path are priced as separate milestones in the written scope. Backup storage and the second-region copy are billed by your cloud provider; you see the cost model before anything is built.

How long does it take?

Two to four weeks, including the first restore drill. The policy comes first, the build follows, and the drill closes the project. It runs longer when many systems are in scope or a legacy database has no supported backup path, and that shows up in the written milestone plan, not as a surprise.

Which systems and databases can you cover?

Managed databases, servers, volumes, file systems and object storage under one policy, with the cloud's own backup service (AWS Backup, for example). We test point-in-time recovery for managed PostgreSQL, SQL Server and MongoDB. Systems with no managed backup path get a scripted dump with its own restore drill. Anything that cannot be restored during the drill is named in the report rather than assumed.

Who owns the vaults, policies and alarms afterwards?

You do. Vaults, schedules and alarms live in your cloud account and are described as code in your repository, so your team can change retention or add a system without us. Vault lock applies to every account, ours included: nobody can delete a recovery point before its retention ends, which is the point of the ransomware case.

Do you need access to our production data, and is it under NDA?

Yes to the NDA: we sign yours or provide ours before the first call that touches your systems. We work through a scoped role in your account rather than copies of your data, and restore drills run in a clean environment inside your account that you can inspect and delete afterwards.

Can the drill reports serve as audit or ATO evidence?

Yes. The policy records RTO, RPO, retention and encryption per system, and each drill report records the date, the environment, the measured recovery time and who ran it. Together they answer the contingency planning questions (NIST 800-53 CP family) auditors and primes ask. We do not write the full ATO package, but these artifacts slot into one.

What if the restore drill fails or misses the RTO?

Then the drill did its job: the report states what failed, what it takes to fix it and what the RTO would be after the fix. A system in the agreed policy that does not come back is a critical defect, so the milestone waits until we fix it at no extra charge. A gap in a system outside the policy becomes a priced change request. On a missed RTO you decide whether to accept with the documented gap or extend the drill.

What happens after the first drill?

The runbook, the drill schedule and the alarms stay with your team. Quarterly drills and the review after each infrastructure change can be run by your staff with the runbook, or by us under a managed support plan from $1,200 a month that also covers daily backup checks. Either way the policy is yours, and nothing stops working if we are not involved.

Next Step

Start With a Two-Week Technical Assessment.

What you have, what it costs to move, what breaks first. Fixed price, written findings, no obligation to continue.

Request a Technical Assessment
01 · 30-min call02 · read access to repos and accounts03 · written findings in 10 business days