Texas Digital Consulting

Modernize

Secure

Operate

Grow

Fixed-price milestones · 5-business-day acceptance · IaC handed over in your repositoryStart with a technical assessment ↗
Every group page lists every tool, each with its own pageAll technologies ↗
Prime contractors · agencies · regulated enterprises · B2B companies
Engineering team across time zones · 24/7 for support plans
Menu
Services
Solutions
Technologies
Services · Operate

Cloud Cost OptimizationPredictable Monthly Bill

Right-sized serverless, idle scale-down, budgets and alerts; a cost model before the move.

Timeline 2–4 weeksPrice from $5,000 or a share of savings
Short AnswerRight-sized serverless, idle scale-down, budgets and alerts; a cost model before the move.
What You Get

Deliverables.Every Item Is a File, a System or a Report.

Six things you can open, run or audit, each tied to the acceptance checklist of a fixed-price milestone.

  • Tagged cost baseline by service, environment and owner, so you see the savings number before you commit
  • Prioritized list of idle, oversized and forgotten resources, ranked by the saving each one is worth
  • Right-sizing plan measured with load profiles before and after, with a rollback for each change
  • Reservations, savings plans and serverless sized to your load shape, with the numbers shown first
  • Budgets, alerts and a tagging policy configured in your account, so the bill does not grow back
  • Monthly cost report your finance team can read, with verified savings against the baseline
How We Do It

Four Steps.Each a Milestone with a Checklist.

Four steps, each a milestone with a price, a date and an acceptance checklist.

01
Tagged cost baseline
Every resource is tagged by service, environment and owner; a baseline is built from your billing data. You approve the report and the savings target before any change.
02
Measured changes
Idle and oversized resources first, then reservations, savings plans and serverless sized to your load shape. Each change ships with a load profile and a rollback.
03
Verify the savings
The next bill is compared with the baseline; load profiles confirm nothing slowed down. You accept the milestone on a savings report with an acceptance checklist.
04
Govern and hand over
Budgets, alerts and a tagging policy configured in your account, plus a monthly cost report for finance. Your team runs it from the runbook, or a support plan does.

Timeline: 2–4 weeks · Price: from $5,000 or a share of savings · Acceptance Rules

Stack

What We Usually Use Here.Every Chip Opens a Page.

What we usually use here. Every chip opens a page; blue is our core stack, dashed is what we migrate from.

All Technologies

Use Cases

When You Need It.Six Situations We See Most.

01Audit of an Untended Account

Baseline, quick wins and a prioritized plan within two weeks.

02Right-sizing After a Lift-and-shift

Instances and databases resized from real metrics, not estimates.

03Reservations and Savings Plans

Commitments sized to steady load with the numbers shown first.

04Serverless Re-platforming for Savings

Idle servers replaced with pay-per-use compute where the model shows a gain.

05Storage and Backup Tiers

Archives moved to cheaper classes with retention rules.

06Cost Governance

Budgets, alerts, tags and a monthly review your finance team can read.

In Depth

What Are Cloud Cost Optimization Services?How We Deliver It.

Cloud cost optimization is the measured reduction of a cloud bill: a baseline by service and owner, quick wins on idle and oversized resources, structural changes where load shape allows, and budgets that keep it from growing back.

Untended cloud accounts typically carry 20 to 40 percent of waste: forgotten environments, oversized instances, unattached storage, resources nobody owns. Texas Digital Consulting starts with a tagged baseline that shows where the money goes, then removes the obvious waste and measures the effect before touching anything structural.

Structural savings come from matching compute to load shape: serverless where load is uneven, reservations and savings plans where it is steady, storage tiers for archives. Right-sizing is measured with load profiles before and after, with a rollback per change. Budgets, alerts and a tagging policy keep the account governed.

The engagement can be priced as a fixed project or as a share of verified savings, and it usually ends with a monthly cost report that continues under managed support.

Updated November 2026 · reviewed by the engineers who deliver this service

Proof

Under NDA.So We Show the Artifacts.

On a call we walk you through anonymized deliverables from this kind of engagement.

Cost Baseline
Savings Plan
Budget Configuration
Monthly Report
Questions

Before You Write to Us.What Clients Ask About This Service.

What does cloud cost optimization cost?

From $5,000 as a fixed project, or a share of verified savings over an agreed period. The tagged baseline shows the expected saving, typically 20 to 40 percent on an untended account, before you choose a model, and the written scope carries the number. Cloud charges stay paid by you directly to the provider.

How long does it take?

Two to four weeks for one account: the baseline in the first week, quick wins and structural changes next, then verification against the following bill. Reservations and savings plans keep paying after the project ends. An estate with several accounts is scoped and priced per account.

Which clouds and tools do you work with?

AWS, Azure and Google Cloud, using the provider's own tools first: Cost Explorer and Budgets on AWS, Cost Management on Azure and Google Cloud. No third-party cost platform is required; if you already run one, we read from it rather than add another. Changes are made through infrastructure as code where the account already uses it.

Do reservations and savings plans lock us in?

Only for the part of your load that was steady across the baseline period, and only after the numbers are shown. Uneven load stays on demand or moves to serverless, so a commitment never covers capacity you might switch off. You approve each commitment, with its term and break-even, before it is bought.

Who owns the changes and the configuration?

You do. Every change is made in your cloud account, and budgets, alerts, the tagging policy and any resized infrastructure are described as code in your repository. Nothing of ours stays in the account after handover, and any qualified team can continue from the runbook.

Do you need access to our billing data, and is it kept confidential?

Yes to both. We sign your NDA or provide ours before the first call that touches your account, and we work through a read-only billing and metrics role that you grant and can revoke at any time. Write access is scoped to the resources in the approved plan and removed at handover.

What if a change slows something down or the saving does not show up?

Every change has a rollback, and we roll back first and investigate second. Load profiles are measured before and after each change, so a regression shows in metrics rather than in a user complaint. If the following bill does not show the expected saving, the savings report names the gap and its cause, and you review it within five business days before the milestone is accepted.

What happens after the project?

Budgets, alerts and the tagging policy stay in your account and keep working without us. The monthly cost report continues under a support plan with a fixed fee, or your team produces it from the runbook. Reservations and savings plans keep paying for their full term either way.

Next Step

Start With a Two-Week Technical Assessment.

What you have, what it costs to move, what breaks first. Fixed price, written findings, no obligation to continue.

Request a Technical Assessment
01 · 30-min call02 · read access to repos and accounts03 · written findings in 10 business days